We continued to see the frame being completed and by the 9th of April the builders pretty much had most of the roof trusses up and it started to really feel like a house!
|
The frame by the 9/4/13
|
We noticed that the pipe for the toilet was put where the spa bath is supposed to be and spoke to the builder, apparently the plumber that put it in has never put a pipe in the wrong place before and although it is a problem, it is fixable! We also had to let them know that we had wanted a roller door on the back of the garage and the frame only has a place for a normal door so that was going to be changed too.
In the mean time we have been looking at the taps, toilets etc that we were included in our quote and we decided we would like to have better quality ones. The builder was happy to give us a credit for them and for us to get our own. We ended up getting what we wanted and it only cost $900 more which we thought was pretty good.