Wednesday 10 July 2013

Septic tank installed

Not a lot has happened so far this week inside. The sink and oven was installed in the kitchen on Monday 8/7

The oven

Kitchen sink

The hot water service was installed on Monday and on Wednesday the huge hole for the septic tank was dug and the tank was put in.

Septic tank

Septic tank drains
A better photo of the roller doors

We got the carpet organised today, the only problem is there isn't enough carpet available to do all the rooms we want. We can get our bedroom and walk-in robe, study and theatre room done before we move in but then we have to wait 7 weeks to get the other 3 bedrooms and games room done. We also got our glass splash back measured up and we've chosen a colour as well.