Not a lot has happened so far this week inside. The sink and oven was installed in the kitchen on Monday 8/7
The oven |
Kitchen sink |
The hot water service was installed on Monday and on Wednesday the huge hole for the septic tank was dug and the tank was put in.
Septic tank |
We got the carpet organised today, the only problem is there isn't enough carpet available to do all the rooms we want. We can get our bedroom and walk-in robe, study and theatre room done before we move in but then we have to wait 7 weeks to get the other 3 bedrooms and games room done. We also got our glass splash back measured up and we've chosen a colour as well.